static milestone for homepage

For the first time in the history of Delhi Metro we have constructed an
elevated track segment over another operational metro line, at a record
height of 21 meters above the ground.

DMRC, Delhi 2014

37.5 m of tunneling in a day with installation of 25 rings using TBM

DMRC, Delhi 2009
An Asian Record

1.7 Km long tunnel completion using TBM in 152 days

DMRC, Delhi 2009

Installation of 211 driven cast in-situ piles in a single day at a site

Mundra, Kutch 2008

Installation of more than 40 driven cast in-situ piles in a single day by a rig

Mundra, Kutch 2008

Deep top hammer drilling in drainage gallery under 2m headroom

Sripada Yallampalli (A.P.) 2006

12.5 Km construction of diaphragm wall by a single agency

Sabarmati, Ahmedabad 2005

First Shiplift Facility for Indian Navy

Sea Bird, Karwar 2005

Ground Improvement by Vibro Compaction Technique

Sea Bird, Karwar 2003

Marine Piling from both ends of Gantry

JNPT, Mumbai 2000

Contiguous Precast Driven Pile

Haldia Port, WB 1999

First Private sector Container Terminal

JNPT, Mumbai 1999

Marine band drain from Spuded pontoon

Kakinada Port 1993

Marine piling from Jack up platform

Tuticorin 1991

Quick grout for sealing of heavy leaks

Kolkata 1985

Heavy deadman anchors, using steel tie rod

Paradip 1984

Jacking of Rectangular RCC boxes

Kolkata 1981

Tube Heading Technique under Railway tracks

Kolkata 1977

Jacked down steel piles

Kolkata 1976

Pipe Jacking under Rail/Road embankments

Howrah 1971

Sand wicks for accelerated soil consolidation

Kolkata 1968

Control of underground subsidence

Kulti 1968

Marine investigation from Jack-up-rigs

Chennai 1967

Small dia bore piling

Bokaro Steel 1966

Soil densification by Vibroflot method

Chennai 1961