ITD Cem is active in industrial infrastructure construction including civil works for Refineries, Petrochemicals, Power Plants, Steel and Fertilizer Plants. It has participated in major industrial projects in the country and is equipped to handle complex interfaces with other areas of Industrial construction.

projects

  • Construction of IIT Ropar

    Construction of different buildings under Phase-1 for IIT Ropar at Ropar, Punjab. SH: Construction of Admin. Block (G+3), Academic Blocks (3 nos. G+3, 1 no G+2, 1 no. SIS), Residential Blocks (T-217 nos. G+3, TAI7 nos. G+3), Hostel Block (Boys-1 % nos. G+3, Girls-1no. G+3, Director Residence (G+1), Dinning Block- 1 no. SIS and Utility blocks (3 nos. single I double storey) including water supply, Sanitary installations, internal electrical installations, Roads, Drainage and Sewerage

  • Sikkim University

    Construction of Various Buildings for Sikkim University – Package II- Construction of Academic Zone (50 Seater BlockII, Teaching Lab), Hostel zone (Boys Hostel, Girls Hostel, Kitchen & Dining for Hostel), Residential Quarters (Type-II – 30 Units, Type III 20 Units, Type IV 20 Units), Sikkim style elevation works including Civil, Electrical & Mechanical Works/Services/ External work (Power House, Point of Supply, Potable UG Tank, STP, Recycled Water Storage Tank, Site Cutting, Filling & Retaining wall, Road work including Retaining wall with Footpath, Entrance gate, Security shed, Internal Road, Footpath / Kerb wall, Peripheral walk way, Parking, Internal & External Water Supply, Sewage disposal system, water heating system, internal and External Electrical installations, Fire Fighting, Fire Alarm, Lift Substation, DG Set, LAN Networking, Audio Visual System etc. and Finishing work of Admin, Library, EWS and Faculty building on EPC Basis.

  • Circuit Bench of Calcutta High Court at Jalpaiguri

    Construction of Circuit Bench of Calcutta High Court at Jalpaiguri


  • Construction of New Haj Tower complex.

    Construction of New Haj Tower Complex including all Civil works, Sanitary & Plumbing works, Internal & External Electrification works, Elevator works and other Ancillary works at New town, Rajarhat, West Bengal.

    Scope of Work:
    All Civil works, Sanitary & Plumbing works, Internal & External Electrification works, Fire fighting work, HVAC work, Landscaping and area development, Internal Road Work, Elevator, Aluminium and structural Glazing works, Acoustic panelling, Auditorium and stage craft and other Ancillary works.

  • LNG Tanks for IHI MUndra

    Constrcution of LNG Tanks for IHI MUndra,

    Scope of Work:
    Construction of LNG Tank for GSPC Limited LNG Regasification Terminal at Mundra, Gujarat, India,

  • Construction of Bose Institute

    Construction of Super Structure for Unified Academic Campus of Bose Institute .

    Scope of work:
    The scope includes Superstructure having academic building, modern research laboratories, library, auditorium and other ancillary works such as substation, pump house, external development works including sewer, water supply, drainage, roads/paths and internal electrification including fire fighting & detection systems, lifts etc.

  • Rail Vikas Nigam Limited

    Construction of seven (07) stations from KAVI SUBHASH (NEW GARIA) to RITWIK GHATAK in NEWGARIA-AIRPORT corridor of KOLKATA METRO RAILWAY LINE (ANS1).

  • BASF GIR CONVENTIONAL BUILDING PROJECTS

    Design and Constructon of Conventional Building 12 numbers & Sanitary Sewerage Line 375rm With Manhole Pit for Chemical Factory of BASF at Dahej, Gujarat.

    Scope of work:
    Scope of work includes Drawing & Design Work, Excavation Work, Backfilling Work, PCC Work, RCC Work for Super Structure, Brick Work, Plastering Work, Door & Window Fixing, False Ceiling Work, Flooring Work, Access Flooring, Painting Work, Plumbing Work, Railing Work, Glass Fixing, Electrical Work, HVAC Work, Fire Fighting Work and following Location :

    Milestone Achieved:
    i. Appreciation Certificate from BASF for 5 million injury free safe man hours.
    ii. Completion of the Project Site with high quality & productivity.