Civil Works for the Project of Fifth Oil Berth at Jawahar Dweep in Mumbai Harbour
Construction of Offshore Approach Trestle, Unloading Platform, Mooring & Berthing Dolphins at Jawahar Dweep for Mumbai Port Trust.
Dry Dock GRSE, Kolkata
Construction of Dry Dock of size 183m X 29m, Inclined Berth of size 183m x 23m and Central Pier of size 183m x 18.6m with associated service buildings and foundation for 250 MT capacity Goliath Crane.
Iron Ore Terminals at Ennore
Design and construction of Iron Ore – Berth 271m long & 24.5m wide, Approach Jetty 130m long and 9m wide, Back up area of 13.5 hectares, Iron ore stock yard, stacker foundation and wagon tippler house, Associated cut and cover tunnels with utility buildings and road work.
Coal Berth Ennore
Berthing Jetty: 325m long and 30m wide, Approach Jetty connecting the breakwater through Berth,130m long.
Second Container Terminal, Chennai
Design and construction of berth structures having deck of size 832m long and 35m wide, Bored pile and precast-in-situ concrete deck, Dredging & reclamation, revetment carried out for construction of heavy duty pavement with interlock concrete paving system for an area of 35 hectares. This is one of the fast track container terminal built for BOT Operator PSA of Singapore.
Liquid Terminal Ennore
Design and construction of berth structures of quay length 413m with 1.2 km skewed approach trestle for supporting crude oil pipelines. Berth structure designed for 3,00,000 DWT vessels supported on bored pile installed from Piling platform and Jack up barges. The approach of 1.2 km long is built as per IRC and IS standard on bridges.
Shiplift Sea Bird Karwar
Construction of Shiplift Facility Civil works package consisting of shiplift piers, ship berthing wharves, ship transfer bays on rail tracks, tunnels for services with control building, shiplift support building and a Seawater pump house with associated Civil, Mechanical & Electrical works.
GCPTCL, Dahej
EPC Contract entailing construction of Liquid Chemical Jetty comprising of 2.4 km approach bridge in open sea on concrete and steel piles (vertical and raker) Berthing dolphins, mooring dolphins and service platform for berthing upto 40,000 DWT vessels. The facility contained product and utility piping and associated mechanical, electrical, fire fighting & instrumentation works.
Birla Copper Dahej
Construction of marine and material handling facility having a Jetty head of 210m length to accommodate upto 40,000 DWT vessels for solid cargo. Rock Bund and Piled Trestle Approach bridge for 2.4 kms constructed in open sea condition.
Multipurpose Berth Visakhapatnam
Construction of Multipurpose Berth for Vizag Port Trust to accommodate 1,50,000 DWT vessels. The berth size being 282m long and 24m wide. The construction involved Under Sea Rock Dredging and Soil Dredging Reclamation was done for area development by rock bund with geo-textile laying & filling the encompassed area.
Container Terminal P&O JNPT
Construction of 600m long wharf with three approach bridges. First Private Sector Container Terminal in India for P&O Ports.
Deep Water Port Kakinada
Multipurpose berth structure 610m long x 25m wide constructed in open sea conditions. Seabed ground improvement by Band Drain technique. Large Scale Reclamation and structure on Diaphragm wall and piles.
Maritime Structures Kandla Port
Construction of 3rd Oil Jetty for Kandla Port Trust, Construction of Liquid Terminal for IFFCO , Construction of Virtual Oil Jetty for Indian Oil at Kandla Port, Construction of 12th Cargo Berth for Kandla Port Trust.
Maritime Structures Goa
Construction of Jetty and Dolphins for floating dry dock and strengthening of Quay walls.
Maritime Structures Tuticorin
Construction of Second Coal Jetty, Construction of Shallow Draught Berth, Construction of 7th Cargo Berth, Construction of Berth for Fishing Harbour, Construction of 9th Cargo Berth, Rehabilitation and repairing of Eastern Breakwater, Construction of Offshore Pump House, Construction of External Coal Handling System of Tuticorin Thermal Power Station, Construction of Offshore Civil Foundation for Conveyor Trestle for Navelli Lignite
Major Maritime Structures Paradip
Construction of 3rd General Cargo Berth, Construction of Fertilizer Berth, Construction of Return Arm from GCB towards IOB, Extension of South Quay, Construction of Western Quay Phase I, Construction of Western Quay Phase II, Construction of Western Quay Phase III, Construction of Trawler Berth, Construction of Multipurpose Berth I, Construction of 2nd Multipurpose Berth with North Quay, Construction of Western Quay and North Quay.
Container Berth & Liquid Jetty Pipavav
Construction of Container Terminal having quay length of 380m with draft of 14.5m, Deck structure supported on bored cast in situ piles, RCC Superstructure with concrete decking.
Maritime Structures Haldia
Construction of Additional Cargo Berth No.10, Construction of Berth No.11, Construction of Barge Terminal, Construction of Berth No.12, Extension of Quay face by precast concrete sheet pile at Northern end of Berth No.5, Construction of Berth No.2 with Back up yard development.
POL Jetty for BP at JNPT
Container Terminal having quay length of 632m long and width of 30m with draft of 17.5m for handling extra large container ships. Deck structure supported on bored cast in-situ piles, Superstructure of RCC with concrete decking. The berthing structure is based on earth retaining structure of diaphragm wall duly held in position with anchor wall with interconnecting tie rods.
Container Terminal Mundra
Berth structure 300m long & 40m wide to accommodate up to 85000 DWT vessels. The work involved rock bund approach & reclamation engineering works.