ITDCem has employed and adapted various specialist technologies and processes in construction projects. These include first time demonstration/application as : |
|
|
|
• Soil densification by Vibroflot method |
- Chennai 1961 |
• Small dia bore piling |
- Bokaro Steel 1966 |
• Marine investigation from Jack-up-rigs |
- Chennai 1967 |
• Control of underground subsidence |
- Kulti 1968 |
• Sandwicks for Accelerated soil Consolidation |
- Kolkata 1968 |
• Pipe Jacking under Rail/ Road embankments |
- Howrah 1971 |
• Jacked down steel piles |
- Kolkata 1976 |
• Tube Heading Technique under Railway tracks |
- Kolkata 1977 |
• Jacking of Rectangular RCC boxes |
- Kolkata 1981 |
• Heavy deadman anchors, using steel tie rod |
- Paradip 1984 |
• Quick grout for sealing of heavy leaks |
- Kolkata 1985 |
• Marine piling from Jack up platform |
- Tuticorin 1991 |
• Marine band drain from Spuded pontoon |
- Kakinada Port 1993 |
• First Private sector Container Terminal |
- JNPT, Mumbai 1999 |
• Contiguous Precast Driven Pilen |
- Haldia Port, West Bengal 1999 |
• Marine Piling from both ends of Gantry |
- JNPT, Mumbai 2000 |
• Ground Improvement by Vibro Compaction Technique |
- Sea Bird, Karwar 2003 |
• First Shiplift Facility for Indian Navy |
- Sea Bird, Karwar 2005 |
• 12.5 Km construction of diaphragm wall by a single agency
| - Sabarmati, Ahmedabad 2005 |
| • Deep top hammer drilling in drainage gallery under 2m headroom |
- Sripada Yallampalli (A.P.) 2006 |
| • Installation of more than 40 driven cast in-situ piles in a single day by a rig |
- Mundra, Kutch 2008 |
| • Installation of 211 driven cast in-situ piles in a single day at a site |
- Mundra, Kutch 2008 |
| • 1.7 Km long tunnel completion using TBM in 152 days |
- DMRC, Delhi 2009 |
| • 37.5m of tunneling in a day with installation of 25 rings |
- DMRC, Delhi 2009 |
|
|
|
| Experience in the use of above technologies enables ITD Cem to undertake a variety of construction activities. ITD Cem also believes that the use of sophisticated technology is an advantage as it enables superior execution of projects in a shorter time frame without compromising on quality |
|
|
|
| Trusted Company in Construction for Quality, Safety and Environment Standards |
|